1) What is the unit of measurement in MKS system for earthwork excavation in ordinary soil?
10M<sup>3</sup>
M<sup>3</sup>
M<sup>2</sup>
10M<sup>2</sup>
2) Which Indicates incidental expense of miscellaneous character in an estimate ?
Contingency
External services
Work-charged establishment
Centage charges
3) Which is preposed as a guidance for the execution of work?
General specification
Brief specification
Rough cost Estimate
Detailed specification
4) What are the essential drawing date required for the preparation of an Estimate?
Plan and Section
Elevation and Section
Plan and Elevation
Plan, Sectional Elevation and detailed drawings
5) What is the useful area or the liveable area of a building?
Plinth
Circulation
Floor
Carpet