LEVELLING SURVEY - Quiz
Categories
Surveyor
LEVELLING SURVEY
1) Which levelling is done to connect the B.M to any intermediate point of the alignment for checking the accuracy of the work?
Fly levelling
Check levelling
Direct levelling
Indirect levelling
2) Which levelling is only the back sight and fore sight readings are taken at every set up of the level and no distance are measured along the direction of levelling?
Direct levelling
Indirect levelling
Fly levelling
Check levelling
3) What is the name of level, if the fly levelling done at the end of day's work to connect the finishing point with the starting point on that particular day?
Fly levelling
Check levelling
Direct levelling
Indirect levelling
4) Which method gives approximate result and so it is adopted in the reconnaissance or in the preliminary survey?
Barometric levelling
Hypsometry levelling
Trigonometrical levelling
Check levelling
5) What is the name of the levelling while the relative elevations of different points are obtained by measuring the vertical angles and horizontal distance?
Fly levelling
Check levelling
Barometric levelling
Trigonometric levelling