www.ITISkill.com
Home
TEMPORARY STRUCTURE - Quiz
Categories
Draughtsman (Civil)
TEMPORARY STRUCTURE
1) What is the scaffolding used for painting, pointing, while washing and maintenance work?
Steel scaffolding
Trestle scaffolding
Cantilever scaffolding
Suspended scaffolding
2) What is the term generally used for the work such as arches and domes?
Moulds
Stripping
Centering
Form work
3) What is the piling method carried out for trenches about 10 meters depth in soft grounds?
Sheet piling
Stay bracing
Box sheeting
Vertical piling
4) What is the distance between the (in single row) standards in single scaffolding?
2.0 m
1.7 m
1.5 m
1.2 m
5) What is the depth of trench while box sheeting carried out in timbering in loose soil?
4 m
5 m
5.5 m
6 m
Submit Quiz