TEMPORARY STRUCTURE - Quiz
Categories
Draughtsman (Civil)
TEMPORARY STRUCTURE
1) What is the approximate depth of vertical sheeting adopted in timbering in soft ground?
10m
12m
15m
17m
2) What is the minimum period for the removal of props to beams and arches for a span of 6m in centrering / form work?
10 Days
14 Days
17 Days
20 Days
3) What is the maximum suitable distance between the two adjacent parallel walls for single flying shore?
5 m
9 m
15 m
18 m
4) Which shoreing is suitable, for existing foundations to be depended?
Dead shore
Flying shore (Single)
Flying shore (Double)
Raking shore
5) How to rectify if settlement of existing foundation has taken place?
By timbering
Under pinning
Single scaffolding
Independent scaffolding