REINFORCED CEMENT CONCRETE - Practice Mode

1) What is the maximum absorption limit for coarse aggregate under water for 24 hours?
Correct Answer: 0.05
2) When does the probs of slab is removed if the span is more than 4.5 m?
Correct Answer: 14 days
3) What is the distance between two yokes in column formwork?
Correct Answer: 1.00 m
4) How many days the R.B slab is kept wet?
Correct Answer: Two to four weeks
5) Which type of beam has more than two supports?
Correct Answer: Continuous beam